The following are the key findings of the first part of an independent assessment of the draft airport and environmental impacts plans ordered by Western Sydney Regional Organisation of Councils.
- The report is hosted here: [http://camden.nsw.gov.au/news/have-your-say-on-the-western-sydney-airport/]
- The first and second parts are here and here.
WSP | Parsons Brinckerhoff were engaged by Western Sydney Regional Organisation of Councils (WSROC) and Macarthur Regional Organisation of Councils (MACROC) to project manage the Peer Review of the Western Sydney Airport draft EIS.
In this capacity WSP | Parsons Brinckerhoff was required to run a competitive tendering process to engage specialists in key areas of interest to the councils. WSP | Parsons Brinckerhoff reported to WSROC under the direction of a Steering Committee (of officers of the participating councils) to confirm which specialists should be engaged, the Steering Committee provided direction throughout the review process and reviewed draft inputs.
The key issues nominated for peer review (and the specialists engaged) were:
- Aviation planning (Arup)
- Overflight noise (Marshall Day)
- Ground based noise and vibration (WSP | Parsons Brinckerhoff)
- Traffic and transport (Arup)
- Air quality and greenhouse gas (Katestone)
- Human health impacts (CHETRE)
- Social and economic (Hill PDA)
- Biodiversity (EMM)
- Surface water and Groundwater (Cardno)
- Impact on Blue Mountains (WSP | Parsons Brinckerhoff)
In its role of project manager, WSP | Parsons Brinckerhoff undertook an overall review of the draft EIS to cover off issues not addressed by the specialists and developed the overarching findings of the peer review.
Key findings
General adequacy
The draft EIS was prepared on a very accelerated program, and it is apparent from media coverage to date that there has been significant Federal political pressure to progress the project rapidly. The draft EIS was prepared over a period of approximately 8 months from engagement of EIS consultants to provision of an initial draft for Commonwealth Department of Environment review. By way of comparison the previous EIS for the project prepared in the late 1990s was undertaken over well over two years. We are aware that the period whereby the Department of Environment reviews the adequacy of the draft EIS prior to approving it for public exhibition was similarly compressed. From our review it is apparent that this has resulted in a number of omissions and limitations, which are discussed throughout this report.
Airport Layout
The draft EIS nominates a preferred airport layout for both the Stage 1 and long term developments, noting that the layouts are indicative only and would be confirmed once an ALC has been appointed. Alternative layouts are presented for both the Stage 1 and long term layouts, however these are all based on a 50/230 degree runway orientation, in other words there has been no consideration of alternative runway orientations – a key determining factor of flight paths. This contrasts with the EIS undertaken in the late 1990s which examines multiple layouts and runway alignments, and gives little visibility of whether the chosen layout, and in particular the runway alignments, achieve the best environmental outcome. Given the time that has lapsed since the previous EIS we would have expected to see a thorough current option-evaluation process to explore alternatives.
Airspace architecture (flight paths)
Chapter 7 of the draft EIS describes the ‘Airspace Architecture and Operation’ of the proposed airport which includes the flight paths for the Stage 1 Scenario (2030), prepared by Air Services Australia on behalf of the Department of Infrastructure. Only one set of flight paths is provided for 2030 in the draft EIS, featuring a ‘merge point’ (a point at which all incoming flights converge) over Blaxland. The concept of merge points is relatively new, and is considered good practice as it allows for incoming flights to minimise thrust and so
reduce noise.
The brief of Air Services Australia as outlined in the draft EIS was to develop a set of flight paths that avoids impacts on existing operations at Kingsford Smith at 2030 (although it was acknowledged that this would be impossible in the long term) and to ensure safety of operations. We have a number of concerns in regard to the flight paths presented in the draft EIS:
- The draft EIS makes clear that they have not been designed to minimise environmental (and in particular noise) impacts on communities.
- They have taken no account of the smaller airports (Camden, Richmond, Bankstown), other than to note that these would be impacted in the long term.
- There is no visibility in the draft EIS of how these contours were arrived at, and how they compare to alternatives considered.
- The contours are ‘proof of concept’ – in other words they are indicative only, and could be revised by a future ALC without recourse to the EPBC Act. As such there is considerable uncertainty over what actual impacts may eventuate.
We have the following recommendations in this regard:
- Greater consideration of alternative options is required, with an additional objective of minimising environmental impacts.
- A holistic review of flight paths taking account of all airports in the Sydney metropolitan area should be undertaken. As part of this, options that allow for flight paths at Kingsford Smith to be modified should be considered.
- In recognition that a future ALC may modify the flight paths from those presented in the EIS, sensitivity testing should have been presented to demonstrate the changes of noise impacts that would result if flight paths are modified.
- The case for a merge point should be further explored, and consideration of alternative merge points should be examined.
Our peer review was limited to an evaluation of the information presented, and did not extend to development of alternative flight paths by our peer review team. As such we cannot comment on whether the flight paths nominated may in fact be the best outcome. In other words the key issue is lack of transparency around the nominated flight paths.
Draft EIS places no explicit limits on key impacts
In a number of areas the EIS does not provide assurances that acceptable environmental thresholds will not be breached, and does not set hard limits on environmental impacts. In the case of aircraft noise this is a reflection of the nature in which aircraft noise is managed in Australia, and this is explored further in Section 4.1.1. However the same is also largely true of other aspects of the draft EIS – the mitigation measures are generally not prescriptive, and there is little in the way of hard limits on impacts. This is no doubt in part due to the fact that the ALC has not yet been appointed, and that the Department of Infrastructure is seeking flexibility over management and mitigation. However this creates uncertainty over the likely future impacts.
Uncertainties over the way the approvals process will operate
As noted above, the project is subject to assessment under the EPBC Act, and the Environment Minister’s agreement (and conditions) are a prerequisite of any subsequent approval under the Airports Act. The draft EIS notes that the future development and expansion of the airport will be subject to further assessment and approval under the Airports Act, and that the preparation of a masterplan will be required within five years of the commencement of the project. This would superseded the current Airport Plan, which is described in the draft EIS as a transitional document. In effect it is implied that once the airport is leased, all future approvals would be under the Airports Act.
What is less clear is:
- What the potential triggers would be for further referrals and potentially approvals under the EPBC Act.
- What further assessment and approval would be required for the construction and operation of Stage 1 (beyond the current EIS and associated Airport Plan approval) once an ALC is appointed and more is known about the actual airport layout and operations.
- What limitations any EPBC Act approval will place on the airport
- What level of community and stakeholder engagement will be accommodated in the process going forward.
We would like to have seen greater clarity in this regard.
Key issues raised by specialists
Table ES.1 identified the key issues raised by the specialists for each environmental issue reviewed.
Table ES.1 Summary of key issues raised
Environmental issue | Key issues raised |
---|---|
Noise (aircraft overflight) |
|
Noise (airport ground-based noise and vibration) |
|
Local air quality and greenhouse gas (GHG) |
|
Regional air quality |
|
Community Health | . |
Aviation planning |
|
Surface transport and access |
|
Human health |
|
Biodiversity and offset strategy |
|
**Surface water and groundwater ** |
|
Social impact |
|
Greater Blue Mountains |
|